Decisions
- 2025-05-28Generic Order
The Mannheim Local Division set the preliminary value in dispute at EUR 4,000,000 in Samsung Electronics' 5G SEP infringement action against ZTE entities concerning EP 4 050 804, and ordered Samsung to pay an additional advance on fees of EUR 26,000. The court found the initial estimate of EUR 500,000 greatly underestimated the value given that the action attacked all standard-essential 5G mobile devices of ZTE and had economic bearing on the broader FRAND rate dispute between the parties.
Legal issues:Value in dispute determination5G standard-essential patentAdditional advance on court feesFRAND rate implications on case value
Documents
| Document title | Date | Public |
|---|---|---|
| action.communication.general | 2026-06-01 | Not public |
| Receipt | 2026-06-01 | Not public |
| Cover sheet | 2026-06-01 | Not public |
| Application document Claimant | 2026-06-01 | Not public |
| Receipt | 2026-06-01 | Not public |
| Cover sheet | 2026-06-01 | Not public |
| Application document Claimant | 2026-06-01 | Not public |
| Application document Claimant | 2026-06-01 | Not public |
| Receipt | 2026-06-01 | Not public |
| Cover sheet | 2026-06-01 | Not public |
| Further pleadings | 2026-06-01 | Not public |
| action.issueOrder.order | 2026-05-11 | Not public |
| Order | 2026-05-11 | Public |
| action.issueOrder.order | 2026-01-28 | Not public |
| Order | 2026-01-28 | Not public |
| Order | 2026-01-28 | Public |
| Receipt | 2026-01-27 | Not public |
| Cover sheet | 2026-01-27 | Not public |
| Application document Claimant | 2026-01-27 | Not public |
| Receipt | 2026-01-27 | Not public |
| Cover sheet | 2026-01-27 | Not public |
| Exhibit document Claimant | 2026-01-27 | Not public |
| Exhibit document Claimant | 2026-01-27 | Not public |
| Exhibit document Claimant | 2026-01-27 | Not public |
| Exhibit document Claimant | 2026-01-27 | Not public |
| Other document Claimant | 2026-01-27 | Not public |
| Other document Claimant | 2026-01-27 | Not public |
| action.phaseChange.interimPhaseOpen | 2026-01-13 | Not public |
| action.issueOrder.order | 2026-01-13 | Not public |
| Order | 2026-01-13 | Public |
| Order | 2026-01-13 | Not public |
| Receipt | 2026-01-09 | Not public |
| Cover sheet | 2026-01-09 | Not public |
| Receipt | 2026-01-09 | Not public |
| Cover sheet | 2026-01-09 | Not public |
| Other document Claimant | 2026-01-09 | Not public |
| action.issueOrder.order | 2025-12-30 | Not public |
| Order | 2025-12-30 | Not public |
| Order | 2025-12-30 | Public |
| Receipt | 2025-12-30 | Not public |
| Cover sheet | 2025-12-30 | Not public |
| Further pleadings | 2025-12-30 | Not public |
| Receipt | 2025-12-30 | Not public |
| Cover sheet | 2025-12-30 | Not public |
| Application document Claimant | 2025-12-30 | Not public |
| Receipt | 2025-12-30 | Not public |
| Cover sheet | 2025-12-30 | Not public |
| Application document Claimant | 2025-12-30 | Not public |
| Application document Claimant | 2025-12-30 | Not public |
| action.issueOrder.order | 2025-12-23 | Not public |
| Order | 2025-12-23 | Public |
| Order | 2025-12-23 | Not public |
| action.issueOrder.order | 2025-12-23 | Not public |
| Order | 2025-12-23 | Public |
| Receipt | 2025-12-19 | Not public |
| Cover sheet | 2025-12-19 | Not public |
| Further pleadings | 2025-12-19 | Not public |
| Further pleadings | 2025-12-19 | Not public |
| Cover sheet | 2025-12-17 | Not public |
| Other document Claimant | 2025-12-17 | Not public |
| Receipt | 2025-12-17 | Not public |
| action.communication.general | 2025-12-15 | Not public |
| Cover sheet | 2025-12-15 | Not public |
| Further pleadings | 2025-12-15 | Not public |
| Receipt | 2025-12-15 | Not public |
| action.issueOrder.order | 2025-12-05 | Not public |
| Order | 2025-12-05 | Public |
| Cover sheet | 2025-12-05 | Not public |
| Application document Claimant | 2025-12-05 | Not public |
| Receipt | 2025-12-05 | Not public |
| Application document Claimant | 2025-12-05 | Not public |
| Cover sheet | 2025-12-05 | Not public |
| Application document Claimant | 2025-12-05 | Not public |
| Receipt | 2025-12-05 | Not public |
| Cover sheet | 2025-12-05 | Not public |
| Application document Claimant | 2025-12-05 | Not public |
| Exhibit document Claimant | 2025-12-05 | Not public |
| Receipt | 2025-12-05 | Not public |
| Application document Claimant | 2025-12-05 | Not public |
| Cover sheet | 2025-12-05 | Not public |
| Application document Claimant | 2025-12-05 | Not public |
| Receipt | 2025-12-05 | Not public |
| Application document Claimant | 2025-12-05 | Not public |
| Cover sheet | 2025-12-05 | Not public |
| Application document Claimant | 2025-12-05 | Not public |
| Receipt | 2025-12-05 | Not public |
| Cover sheet | 2025-11-10 | Not public |
| Application document Defendant | 2025-11-10 | Not public |
| Receipt | 2025-11-10 | Not public |
| Statement of rejoinder | 2025-11-10 | Not public |
| Statement of rejoinder | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Exhibit document Defendant | 2025-11-10 | Not public |
| Cover sheet | 2025-11-10 | Not public |
| Receipt | 2025-11-10 | Not public |
| Exhibit | 2025-10-07 | Not public |
| Exhibit | 2025-10-07 | Not public |
| Cover sheet | 2025-10-07 | Not public |
| Receipt | 2025-10-07 | Not public |
| action.issueOrder.order | 2025-09-26 | Not public |
| Order | 2025-09-26 | Public |
| action.issueOrder.order | 2025-09-26 | Not public |
| Order | 2025-09-26 | Not public |
| Other Documents | 2025-09-26 | Not public |
| invitation to comment | 2025-09-17 | Not public |
| Comments on Confidentiality Request | 2025-09-17 | Not public |
| pre-order R 262A RoP | 2025-09-12 | Not public |
| Template-Order | 2025-09-12 | Not public |
| Receipt | 2025-09-09 | Not public |
| Request under Rule 262(A) | 2025-09-08 | Not public |
| Request under ROP 262.2 | 2025-09-08 | Not public |
| Acknowledgement-of-lodging | 2025-09-08 | Not public |
| Reply to Statement of Defense | 2025-09-08 | Not public |
| Reply to Statement of Defense | 2025-09-08 | Not public |
| Acknowledgement-of-lodging | 2025-09-08 | Not public |
| Reply to Statement of Defense | 2025-09-08 | Not public |
| Reply to Statement of Defense | 2025-09-08 | Not public |
| Acknowledgement-of-lodging | 2025-09-08 | Not public |
| Exhibit rop FRAND 3 part 2 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Exhibit D FRAND 13 | 2025-09-08 | Not public |
| Reply to Statement of Defense | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Exhibit D FRAND 18 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 | 2025-09-08 | Not public |
| Exhibit rop FRAND 3 part 3 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Set of Exhibits D FRAND 15 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Set of Exhibits D FRAND 21 | 2025-09-08 | Not public |
| Exhibit rop FRAND 3 part 1 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Exhibit D FRAND 13 | 2025-09-08 | Not public |
| Reply to Statement of Defense | 2025-09-08 | Not public |
| Exhibit rop 11 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Set of Exhibits D FRAND 16 | 2025-09-08 | Not public |
| Exhibit rop FRAND 6 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Exhibit D FRAND 18 | 2025-09-08 | Not public |
| Exhibit rop FRAND 3 part 1 | 2025-09-08 | Not public |
| Exhibit rop FRAND 3 part 2 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Exhibit D FRAND 2 | 2025-09-08 | Not public |
| Exhibit rop FRAND 3 part 4 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 | 2025-09-08 | Not public |
| Exhibit rop FRAND 4 | 2025-09-08 | Not public |
| Exhibit rop FRAND 3 part 4 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Exhibit D FRAND 2 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Exhibit D FRAND 11 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Set of Exhibits D FRAND 16 | 2025-09-08 | Not public |
| Exhibit rop FRAND 2 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Set of Exhibits D FRAND 21 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Exhibit D FRAND 11 | 2025-09-08 | Not public |
| Exhibit rop FRAND 1 | 2025-09-08 | Not public |
| Exhibit rop FRAND 5 - Set of Exhibits D FRAND 15 | 2025-09-08 | Not public |
| Exhibit rop FRAND 2 | 2025-09-08 | Not public |
| Exhibit rop FRAND 1 | 2025-09-08 | Not public |
| Exhibit rop FRAND 4 | 2025-09-08 | Not public |
| Exhibit rop FRAND 3 part 3 | 2025-09-08 | Not public |
| Exhibit rop 4a | 2025-09-08 | Not public |
| Panel-Appointment | 2025-08-08 | Not public |
| Outcome of the Order | 2025-08-04 | Not public |
| technical closure of the workflow | 2025-08-04 | Public |
| Outcome of the Order | 2025-08-04 | Not public |
| technical closure of workflow | 2025-08-04 | Public |
| final Order R 262.A. | 2025-07-29 | Not public |
| Final Order R 262.A | 2025-07-29 | Not public |
| Outcome of the Order | 2025-07-25 | Not public |
| R. 262A RoP SoD (copy due to technical reasons) | 2025-07-25 | Public |
| R. 262A RoP SoD (copy due to technical reasons) | 2025-07-25 | Not public |
| R. 262A RoP SoD | 2025-07-25 | Not public |
| R. 262A RoP SoD | 2025-07-25 | Public |
| R. 262A RoP SoD | 2025-07-25 | Not public |
| 250725 Comments on Order R. 262A (signed) | 2025-07-25 | Not public |
| invitation to comment | 2025-07-18 | Not public |
| Samsung Comment | 2025-07-18 | Not public |
| pre-order R. 262A RoP | 2025-07-11 | Not public |
| Formal-checks_Notification-of-positive-outcome | 2025-07-11 | Not public |
| Formal-checks_Notification-of-positive-outcome | 2025-07-11 | Not public |
| Formal-checks_Notification-of-positive-outcome | 2025-07-11 | Not public |
| Receipt | 2025-07-10 | Not public |
| 250708 confidentiality request SoD - R. 262A (signed) | 2025-07-08 | Not public |
| 250708 confidentiality request SoD - R. 262 II RoP (signed) | 2025-07-08 | Not public |
| Acknowledgement-of-lodging | 2025-07-08 | Not public |
| 250708 Statement_of_Defence ZTE (signed) | 2025-07-08 | Not public |
| 250708 Statement_of_Defence ZTE (signed) | 2025-07-08 | Not public |
| Acknowledgement-of-lodging | 2025-07-08 | Not public |
| 250708 Statement_of_Defence ZTE (signed) | 2025-07-08 | Not public |
| 250708 Statement_of_Defence ZTE (signed) | 2025-07-08 | Not public |
| Acknowledgement-of-lodging | 2025-07-08 | Not public |
| Exhibit-D-FRAND-29_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-24_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-9_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-31_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit D 3 - Unisoc_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-35 | 2025-07-08 | Not public |
| Exhibit-D-FRAND-17_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit D 4 - Counterclaim for Revocation ZTE vs Samsung | 2025-07-08 | Not public |
| Exhibit-D-FRAND-24_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-28 | 2025-07-08 | Not public |
| Exhibit-D-FRAND-34_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-12_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-17_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-15_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-22_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-7_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-10_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-22_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-18_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit D 2 - Mediatek_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-2_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-26_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-3_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-33 | 2025-07-08 | Not public |
| Exhibit-D-FRAND-20_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit D 2 - Mediatek_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-25_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-6_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-23_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-16_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-19_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-13_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-29_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-11_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-12_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-1_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-5_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-13_CONFIDENTIAL | 2025-07-08 | Not public |
| 250708 Statement_of_Defence ZTE (signed) | 2025-07-08 | Not public |
| Exhibit-D-FRAND-32_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-3_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-29a_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-25_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-30_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-7_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-9_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-20_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-18_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-4_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-1_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-15_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-27_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-36 | 2025-07-08 | Not public |
| 250708 Statement_of_Defence ZTE (signed) | 2025-07-08 | Not public |
| Exhibit-D-FRAND-11_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-30_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-31_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-4_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-29a_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-2_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-19_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-37_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-23_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-14_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-14_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-21_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-34_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-8_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-5_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-21_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-6_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit D 3 - Unisoc_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-10_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-26_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-37_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-8_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit D 1 feature breakdown | 2025-07-08 | Not public |
| Exhibit-D-FRAND-16_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-27_CONFIDENTIAL | 2025-07-08 | Not public |
| Exhibit-D-FRAND-32_CONFIDENTIAL | 2025-07-08 | Not public |
| Outcome of the Order | 2025-07-03 | Not public |
| extension | 2025-07-03 | Public |
| Receipt | 2025-07-03 | Not public |
| 250703 ZTE Request extension of deadline SoD and CC (signed)C | 2025-07-03 | Not public |
| Outcome of the Order | 2025-06-13 | Not public |
| Final order | 2025-06-13 | Public |
| Template-Order | 2025-06-13 | Not public |
| Receipt | 2025-06-05 | Not public |
| rop10 | 2025-06-04 | Not public |
| R.9 Application (comment) | 2025-06-04 | Not public |
| Headnote-and-Keywords | 2025-05-28 | Not public |
| value in dispute | 2025-05-28 | Public |
| value in dispute | 2025-05-28 | Not public |
| Outcome of the Order | 2025-05-09 | Not public |
| Final order harmonization time periods | 2025-05-09 | Public |
| Headnote-and-Keywords | 2025-05-09 | Not public |
| Outcome of the Order | 2025-05-09 | Not public |
| Final order harmonization time periods | 2025-05-09 | Public |
| Comment | 2025-05-09 | Not public |
| invitation to comment | 2025-05-09 | Not public |
| Receipt | 2025-05-09 | Not public |
| Receipt | 2025-05-09 | Not public |
| 250508 ZTE Request alignment of deadlines | 2025-05-08 | Not public |
| 250508 ZTE Request alignment of deadlines | 2025-05-08 | Not public |
| Acknowledgement of access to case | 2025-05-06 | Not public |
| Notification Of Service | 2025-04-22 | Not public |
| Service details | 2025-04-22 | Not public |
| Acknowledgement of access to case | 2025-04-16 | Not public |
| Notification Of Service | 2025-04-16 | Not public |
| Service receipt | 2025-04-16 | Not public |
| Service receipt details | 2025-04-16 | Not public |
| Acknowledgement of access to case | 2025-03-17 | Not public |
| Receipt | 2025-03-11 | Not public |
| 2025-03-11 Samsung - Application R.262.2 RoP | 2025-03-11 | Not public |
| Notification Of Service | 2025-03-11 | Not public |
| Service receipt | 2025-03-11 | Not public |
| Receipt | 2025-03-11 | Not public |
| Receipt | 2025-03-07 | Not public |
| Receipt | 2025-03-07 | Not public |
| Receipt | 2025-03-07 | Not public |
| 2025-03-06 Samsung R. 9 Application for submission of Confidentiality Request R.262.2 | 2025-03-06 | Not public |
| 2025-03-06 Samsung Confidentiality Request R.262.2 | 2025-03-06 | Not public |
| 2025-03-06 Samsung R. 262.2 Application (Exhibit rop 1) | 2025-03-06 | Not public |
| rop 8 | 2025-03-06 | Not public |
| rop 1 - Confidential | 2025-03-06 | Not public |
| rop 1 - Confidential | 2025-03-06 | Not public |
| rop 7 | 2025-03-06 | Not public |
| rop 2 | 2025-03-06 | Not public |
| 2025-03-06 Samsung R. 9 Application - Submission of Exhibits | 2025-03-06 | Not public |
| rop 3 | 2025-03-06 | Not public |
| rop 4 | 2025-03-06 | Not public |
| rop 9 | 2025-03-06 | Not public |
| rop 6 | 2025-03-06 | Not public |
| rop 5 | 2025-03-06 | Not public |
| Document from EPO | 2025-03-06 | Not public |
| communicationCheck | 2025-03-06 | Not public |
| Document from EPO | 2025-03-05 | Not public |
| Letter-for-Service | 2025-03-05 | Not public |
| Letter-for-Service | 2025-03-05 | Not public |
| Letter-for-Service | 2025-03-05 | Not public |
| Panel-Appointment | 2025-03-04 | Not public |
| EPO-Request-for-case-pending | 2025-03-04 | Not public |
| Receipt | 2025-03-04 | Not public |
| Formal-checks_Notification-of-positive-outcome | 2025-03-04 | Not public |
| Panel-Appointment | 2025-03-03 | Not public |
| Acknowledgement-of-lodging | 2025-02-28 | Not public |
| 2025-02-28_Samsung_StatementOfClaimEP804 | 2025-02-28 | Not public |
| rop 0 | 2025-02-28 | Not public |
| 2025-02-28_Samsung_StatementOfClaimEP804 | 2025-02-28 | Not public |