UPC Analytics
DEEN

Entscheidungen

DatumFallKammerVerfahrensartAntragAusgangZusammenfassung
2025-05-08UPC_CFI_582/2024Brussels LDGeneric applicationAbgewiesenThe Brussels Local Division dismissed Yealink's application for rectification (R. 353 RoP) of the Final Order of 21 March 2025, which had dismissed Barco's application for provisional measures and ordered Barco to pay Yealink's costs up to the EUR 112,000 ceiling. Yealink sought to clarify the order by adding the word 'interim' to the costs award, but the court found no clerical error, miscalculation or obvious omission warranting rectification. The court confirmed that the costs award of EUR 112,000 against Barco (the unsuccessful party in the provisional measures) was already clearly an interim award on the face of the Final Order.
2025-03-21UPC_CFI_582/2024Brussels LDApplication for provisional measuresPI abgelehntThe Local Division Brussels dismissed Barco's application for provisional measures against Yealink due to lack of urgency. Barco had waited an unreasonably long period before filing, having been aware of the allegedly infringing products since at least May 2023. Barco was ordered to pay Yealink's costs up to EUR 112,000. Dispute value set at EUR 1,000,000.
2024-11-20UPC_CFI_368/2024Dusseldorf LDGeneric applicationNur prozessualThe Düsseldorf Local Division ruled on Valeo Electrification's application for rectification (R. 353 RoP) of the preliminary injunction order of 31 October 2024 against Magna PT entities concerning EP 3 320 604 B1. The rectification related to the product scope and spare-parts exception included in the order. The court issued a corrected operative part clarifying the terms of the injunction.
2024-10-31ACT_37931/2024Dusseldorf LDApplication for provisional measuresEinstweilige VerfügungPI erteiltOrder from the Düsseldorf Local Division (UPC_CFI_347/2024) granting Valeo Electrification's application for provisional measures against Magna PT entities concerning EP 3 320 602 B1. The Court issued a preliminary injunction prohibiting the defendants from manufacturing, offering, marketing, using or importing the infringing automotive electrification products. Penalty payments of up to EUR 250,000 per violation were ordered. The injunction was conditional on Valeo providing security of EUR 2,500,000. The Court addressed issues of patent proprietorship (rebuttable presumption), urgency, and validity, finding the patent more likely than not valid.
2024-10-31UPC_CFI_368/2024Dusseldorf LDApplication for provisional measuresPI erteiltThe Düsseldorf Local Division granted Valeo Electrification a preliminary injunction against Magna PT entities prohibiting them from offering, placing on the market, using, importing or storing certain electric motor generators (challenged embodiment I) and the 7HDT400 gearbox assembled with those generators (challenged embodiment II) in Germany and France, concerning EP 3 320 604 B1. A temporary exception was granted for BMW 2 Series Active Tourer and Mini Countryman, conditional on defendants providing security of EUR 500,000 by 21 November 2024. Recurring penalty payments of up to EUR 250,000 per violation were imposed. Defendants were ordered to pay EUR 14,700 provisionally in costs. The injunction was made enforceable upon provision by the applicant of a EUR 2,500,000 bank guarantee.
2024-09-02UPC_CFI_368/2024Dusseldorf LDGeneric applicationAbgewiesenPresident of the UPC Court of First Instance dismissed Magna entities' application for review of the allocation of a technically qualified judge. The Court held that parties have no right to request a specific technical background for a technically qualified judge and that partiality is the only permissible objection to a judge's participation.
2024-08-21UPC_CFI_347/2024Dusseldorf LDApplication RoP262ANur prozessualDüsseldorf Local Division issued a confidentiality order under R.262A RoP restricting access to confidential information submitted by Magna entities (defendants) in their Statement of defence and Rejoinder, relating to supply chain and trade secrets. Access was limited to specific named representatives of Valeo.