UPC CFI 364/2025
Apr 23, 2025·EP3812870 · FLOW CONTROL SYSTEM
- Case details
- StatusCase Closed (Settled)ActionCounterclaim for infringementCategoryCounterclaim for infringement
- Parties
- Respondents
- IMI Hydronic Engineering Deutschland GmbHOperating co.
Representatives- Clemens Bauer-Müller Schupfner & Partner mbB
- Division
- Paris CD
- Technology
- InstrumentsControl
- Mechanical engineeringThermal processes and apparatus
- Other fieldsCivil engineering
- Language
- English
- First decided
- Sep 23, 2025
- Last decision
- Mar 26, 2026
- EPO Opposition
- Bauer, ClemensAdmissible2023-06-21
| Infringement found | Median days to first decision | |
|---|---|---|
| All UPC | 53% (62/117) | 124 |
| Paris CD | Locked | Locked |
| Judge Marjolein Visser | Locked | Locked |
| Judge Maximilian Haedicke | Locked | Locked |
| Judge Andrea Perronace | — | Locked |
At the UPC: Belparts Group N.V. (5 cases)·IMI Hydronic Engineering Deutschland GmbH (2 cases)
This dispute contains 1 other proceedings
2 other defendants litigating the same or a related patent
- 2026-03-26Counterclaim for infringementPublic
Summary: Decision of the Paris Central Division dated 26 March 2026 declaring the counterclaim for infringement (UPC_CFI_364/2025) closed following an out-of-court settlement between Belparts Group N.V. and IMI Hydronic Engineering Deutschland GmbH. This is the counterpart order to UPC_CFI_104/2025: the counterclaim for infringement by Belparts was withdrawn simultaneously with IMI's withdrawal of its revocation action following settlement. No cost decision was requested.
Show the legal issues (2)
- Withdrawal of counterclaim for infringement following settlement
- Stay of proceedings under R. 295(d) RoP
- 2025-12-18Counterclaim for revocationPublic
Summary: The Central Division Paris issued a procedural order following the interim conference of 11 December 2025 in proceedings between IMI Hydronic Engineering Deutschland GmbH (revocation action) and Belparts Group N.V. (patent proprietor and counterclaim for infringement). The order addresses IMI's request for security for costs of EUR 500,000. The Court applied the test from the CoA decision in Chint v Jingao (July 2025): security requires a legitimate and real concern about recoverability of costs. As Belparts is seated in Belgium (EU member state), IMI had not demonstrated enforcement difficulties, and the security request appears to have been denied. The full dispositif was not captured in the available text extract.
Show the legal issues (3)
- Security for costs under R.158 RoP and Art.69(4) UPCA
- Standard for ordering security for costs
- EU-domiciled defendant and enforcement risk
- 2025-11-03Revocation ActionPublic
Summary: The Central Division Paris issued a procedural order under R. 340 RoP joining the counterclaim for revocation from the Munich Local Division to the pending revocation action before the Central Division Paris, to avoid contradictory decisions on EP 3 812 870.
Show the legal issues (3)
- R. 340 RoP connection joinder of revocation and counterclaim
- Avoiding contradictory decisions
- Coordination between Local Division and Central Division
- 2025-09-23Counterclaim for infringementPublic
Summary: Single-judge procedural order of the CD Paris judge-rapporteur on Belparts' R.340.1 RoP connection-joinder request to have the CD Paris counterclaim for infringement (CC_19180/2025, within IMI Hydronic Engineering Deutschland GmbH's revocation action ACT_6739/2025) heard together with Belparts' earlier infringement action pending before LD Munich. Rather than granting or denying the request, the judge-rapporteur is inclined to find it would not serve R.340's underlying purpose and questions whether R.340 'hearing together' can effect a referral to another division at all (citing Art. 33 UPCA and CoA UPC_CoA_106/2024), and instead invites the parties to comment and reformulate the request within 10 days.
Show the legal issues (3)
- R.340.1 RoP connection joinder
- Art. 33 UPCA competence and referral between local/central divisions
- consolidation of a central division counterclaim for infringement with a local division infringement action
| Document title | Date | Public |
|---|---|---|
| Case closed | 2026-03-26 | Not public |
| Decision | 2026-03-26 | Not public |
| Decision | 2026-03-26 | Public |
| Receipt | 2026-03-19 | Not public |
| Cover sheet | 2026-03-19 | Not public |
| Document Claimant | 2026-03-19 | Not public |
| Receipt | 2026-03-13 | Not public |
| Cover sheet | 2026-03-13 | Not public |
| Application document Defendant | 2026-03-13 | Not public |
| Publication | 2026-02-18 | Not public |
| Communication | 2026-02-04 | Not public |
| Receipt | 2026-02-04 | Not public |
| Cover sheet | 2026-02-04 | Not public |
| Other document Defendant | 2026-02-04 | Not public |
| Receipt | 2026-01-29 | Not public |
| Cover sheet | 2026-01-29 | Not public |
| Other document Defendant | 2026-01-29 | Not public |
| Receipt | 2026-01-29 | Not public |
| Cover sheet | 2026-01-29 | Not public |
| Other document Claimant | 2026-01-29 | Not public |
| Communication | 2026-01-19 | Not public |
| Oral procedure opened | 2026-01-19 | Not public |
| Receipt | 2026-01-14 | Not public |
| Cover sheet | 2026-01-14 | Not public |
| Other document Defendant | 2026-01-14 | Not public |
| Other document Defendant | 2026-01-14 | Not public |
| Other document Defendant | 2026-01-14 | Not public |
| Other document Defendant | 2026-01-14 | Not public |
| Receipt | 2025-12-23 | Not public |
| Cover sheet | 2025-12-23 | Not public |
| Other document Defendant | 2025-12-23 | Not public |
| Receipt | 2025-12-22 | Not public |
| Cover sheet | 2025-12-22 | Not public |
| Other document Defendant | 2025-12-22 | Not public |
| Other document Defendant | 2025-12-22 | Not public |
| Interim procedure opened | 2025-12-18 | Not public |
| Written procedure closed | 2025-12-18 | Not public |
| Order | 2025-12-18 | Not public |
| Order | 2025-12-18 | Public |
| Order | 2025-12-18 | Not public |
| Order | 2025-12-18 | Public |
| Order | 2025-12-08 | Not public |
| Order | 2025-12-08 | Public |
| Cover sheet | 2025-12-04 | Not public |
| Other document Claimant | 2025-12-04 | Not public |
| Receipt | 2025-12-04 | Not public |
| Communication | 2025-11-03 | Not public |
| Order | 2025-11-03 | Not public |
| Order | 2025-11-03 | Public |
| Cover sheet | 2025-10-02 | Not public |
| Other document | 2025-10-02 | Not public |
| Receipt | 2025-10-02 | Not public |
| Publication of order | 2025-09-26 | Not public |
| Order | 2025-09-23 | Not public |
| Order | 2025-09-23 | Public |
| Receipt | 2025-09-11 | Not public |
| Procedural application pursuant to R. 340.1 RoP | 2025-09-11 | Not public |
| Exhibit ES29 | 2025-09-11 | Not public |
| Acknowledgement-of-lodging | 2025-08-29 | Not public |
| Exhibit_MSP_11 | 2025-08-29 | Not public |
| Rejoinder_to_Reply_to_Counterclaim_for_Infringement | 2025-08-29 | Not public |
| Acknowledgement-of-lodging | 2025-07-30 | Not public |
| Exhibit ES 25 | 2025-07-30 | Not public |
| Exhibit ES 24a | 2025-07-30 | Not public |
| Exhibit ES 23 | 2025-07-30 | Not public |
| Exhibit ES 28 | 2025-07-30 | Not public |
| Exhibit ES 24b | 2025-07-30 | Not public |
| Exhibit ES 26 | 2025-07-30 | Not public |
| Rejoinder to Revocation Action and Reply to Counterclaim for Infringement | 2025-07-30 | Not public |
| Exhibit ES 27 | 2025-07-30 | Not public |
| Formal-checks_Notification-of-positive-outcome | 2025-07-03 | Not public |
| Acknowledgement-of-lodging | 2025-07-03 | Not public |
| Exhibit_MSP8 | 2025-07-03 | Not public |
| Exhibit_MSP6 | 2025-07-03 | Not public |
| Exhibit_MSP_D1(new) | 2025-07-03 | Not public |
| Submission_Claimant | 2025-07-03 | Not public |
| Exhibit_MSP7 | 2025-07-03 | Not public |
| Exhibit_MSP10 | 2025-07-03 | Not public |
| Exhibit_MSP9 | 2025-07-03 | Not public |
| communicationCheck | 2025-05-05 | Not public |
| Panel-Appointment | 2025-05-05 | Not public |
| Document from EPO | 2025-05-01 | Not public |
| Panel-Appointment | 2025-04-29 | Not public |
| EPO-Request-for-case-pending | 2025-04-28 | Not public |
| Acknowledgement-of-lodging | 2025-04-28 | Not public |
| Formal-checks_Notification-of-positive-outcome | 2025-04-28 | Not public |
| Exhibit ES9a.pdf | 2025-04-28 | Not public |
| Exhibit ES22.pdf | 2025-04-28 | Not public |
| Exhibit ES12.pdf | 2025-04-28 | Not public |
| Exhibit ES14.pdf | 2025-04-28 | Not public |
| Exhibit ES4 | 2025-04-28 | Not public |
| Exhibit ES17b.pdf | 2025-04-28 | Not public |
| Counterclaim for infringement (corrected version) | 2025-04-28 | Not public |
| Exhibit ES1 | 2025-04-28 | Not public |
| Exhibit ES9b.pdf | 2025-04-28 | Not public |
| Exhibit ES19.pdf | 2025-04-28 | Not public |
| Exhibit ES6.pdf | 2025-04-28 | Not public |
| Exhibit ES16.pdf | 2025-04-28 | Not public |
| Exhibit ES11.pdf | 2025-04-28 | Not public |
| Exhibit ES2 | 2025-04-28 | Not public |
| Exhibit ES20.pdf | 2025-04-28 | Not public |
| Exhibit ES3a | 2025-04-28 | Not public |
| Exhibit ES8.pdf | 2025-04-28 | Not public |
| Exhibit ES0 (corrected version) | 2025-04-28 | Not public |
| Formal Response to the request for amendments | 2025-04-28 | Not public |
| Counterclaim for infringement | 2025-04-28 | Not public |
| Exhibit ES21.pdf | 2025-04-28 | Not public |
| Exhibit ES13.pdf | 2025-04-28 | Not public |
| Exhibit ES10.pdf | 2025-04-28 | Not public |
| Exhibit ES3 | 2025-04-28 | Not public |
| Exhibit ES18.pdf | 2025-04-28 | Not public |
| Exhibit ES7.pdf | 2025-04-28 | Not public |
| Exhibit ES5.pdf | 2025-04-28 | Not public |
| Exhibit ES15.pdf | 2025-04-28 | Not public |
| Exhibit ES17a.pdf | 2025-04-28 | Not public |
| Formal-checks_Request-for-correction | 2025-04-25 | Not public |
| Exhibit ES21.pdf | 2025-04-23 | Not public |
| Exhibit ES10.pdf | 2025-04-23 | Not public |
| Exhibit ES5.pdf | 2025-04-23 | Not public |
| Exhibit ES4 | 2025-04-23 | Not public |
| Exhibit ES7.pdf | 2025-04-23 | Not public |
| Exhibit ES9b.pdf | 2025-04-23 | Not public |
| Exhibit ES19.pdf | 2025-04-23 | Not public |
| Exhibit ES8.pdf | 2025-04-23 | Not public |
| Exhibit ES17a.pdf | 2025-04-23 | Not public |
| Exhibit ES16.pdf | 2025-04-23 | Not public |
| Exhibit ES18.pdf | 2025-04-23 | Not public |
| Exhibit ES22.pdf | 2025-04-23 | Not public |
| Exhibit ES13.pdf | 2025-04-23 | Not public |
| Exhibit ES20.pdf | 2025-04-23 | Not public |
| Exhibit ES2 | 2025-04-23 | Not public |
| Exhibit ES12.pdf | 2025-04-23 | Not public |
| Exhibit ES14.pdf | 2025-04-23 | Not public |
| Exhibit ES6.pdf | 2025-04-23 | Not public |
| Exhibit ES3a | 2025-04-23 | Not public |
| Exhibit ES0 | 2025-04-23 | Not public |
| Exhibit ES9a.pdf | 2025-04-23 | Not public |
| Exhibit ES11.pdf | 2025-04-23 | Not public |
| Counterclaim for infringement | 2025-04-23 | Not public |
| Exhibit ES3 | 2025-04-23 | Not public |
| Exhibit ES1 | 2025-04-23 | Not public |
| Exhibit ES15.pdf | 2025-04-23 | Not public |
| Exhibit ES17b.pdf | 2025-04-23 | Not public |
Belparts Group N.V.'s counterclaim for infringement of EP 3 812 870 (flow control system) against IMI Hydronic Engineering Deutschland GmbH was withdrawn following an out-of-court settlement, simultaneously with IMI's withdrawal of its revocation action (UPC_CFI_104/2025). The Paris Central Division declared the proceedings closed under R. 265.1 RoP; no costs decision was requested or issued.
Withdrawal of counterclaim for infringement by Belparts permissible where both parties consent following settlement
ClaimantLegal basis: R. 265.1 RoPNote: Court permitted withdrawal as no final decision had been taken and neither party had a legitimate interest in a court ruling on the merits.
No rejected arguments captured.