Oct 15, 2024·EP3290200: COATED STEEL STRIPS, METHODS OF MAKING THE SAME, METHODS OF USING THE SAME, STAMPING BLANKS PREPARED FROM THE SAME, STAMPED PRODUCTS PREPARED FROM THE SAME, AND ARTICLES OF MANUFACTURE WHICH CONTAIN SUCH A STAMPED PRODUCT

Decisions
  • 2025-01-09
    Generic application

    Order by the President of the Court of First Instance granting XPENG et al.'s application to change the language of proceedings from German to English (the language in which the patent was granted) pursuant to Rule 323 RoP. ArcelorMittal required to provide English translations of the Statement of Claim at its own expense within 30 days.

    Legal issues:Language of proceedings change (Rule 323 RoP)Preliminary objection on language (Rule 19(c) RoP)Translation obligations
Documents
Document titleDatePublic
Case Closure Formal Check2025-07-03Not public
Outcome of the Order2025-04-29Not public
Withdrawal decision2025-04-29Public
Receipt2025-04-08Not public
Acknowledgement-of-lodging2025-04-08Not public
Statement of defence and application to stay2025-04-08Not public
250407_Withdrawal action_ACT_54607-2024 (signed)2025-04-07Not public
Receipt2025-02-25Not public
Exhibit 26 Excerpt from the publication Spurenelemente in Stahlen entitled Approximate order of trace elements in steel2025-02-24Not public
Exhibit 23.1 Official report on CETIM operations carried out in Saint-Etienne on the right A-pillar of the XPENG G92025-02-24Not public
Exhibit 17 CETIM report on the right A-pillar2025-02-24Not public
Exhibit 20 EUROFINSEAG report on the right A-pillar2025-02-24Not public
Exhibit 23.4 Official report on CETIM operations carried out in Nantes on the right A-pillar of the XPENG G92025-02-24Not public
Exhibit 23.3 Official report on CETIM operations carried out in Saint-Etienne on the rear rail of the XPENG G92025-02-24Not public
Exhibit 24.2 Official report on EUROFINSEAG operations carried out on the left A-pillar2025-02-24Not public
Exhibit 23.6 Official report on CETIM operations carried out in Nantes on the rear rail of the XPENG G92025-02-24Not public
Exhibit 21 EUROFINSEAG report on the left A-pillar2025-02-24Not public
Exhibit 23.5 Official report on CETIM operations carried out in Nantes on the left A-pillar of the XPENG G92025-02-24Not public
Exhibit 23.2 Official report on CETIM operations carried out in Saint-Etienne on the left A-pillar of the XPENG G92025-02-24Not public
Exhibit 22 EUROFINSEAG report on the rear rail2025-02-24Not public
Exhibit 19 CETIM report on the rear rail2025-02-24Not public
CP_ 250212_Statement of claim ArcelorMittal_English (signed)2025-02-24Not public
Exhibit 18 CETIM report on the left A-pillar2025-02-24Not public
Exhibit 24.1 Official report on EUROFINSEAG operations carried out on the right A-pillar2025-02-24Not public
Exhibit 15 Official report of findings on breaking down the XPENG G9 on 9-16 April 20242025-02-24Not public
Exhibit 24.3 Official report on EUROFINSEAG operations carried out on the rear rail2025-02-24Not public
Receipt2025-02-20Not public
Final ordre R 262A Exhibit 8 Claimant2025-02-18Public
CP_ 250212_Statement of claim ArcelorMittal_English (signed)2025-02-14Not public
Comments confidentiality of Exhibit 82025-02-13Not public
PO 262A2025-02-07Not public
Panel-Appointment2025-01-27Not public
Notification Of Service2025-01-20Not public
Order align deadlines 13/12/20242025-01-20Not public
Letter-for-Service2025-01-20Not public
Notification Of Service2025-01-20Not public
Order align deadlines 13/12/20242025-01-20Not public
Notification Of Service2025-01-20Not public
Order align deadlines 13/12/20242025-01-20Not public
Notification Of Service2025-01-20Not public
Order align deadlines 13/12/20242025-01-20Not public
Order align dealine 13/12/20242025-01-20Not public
Headnote-and-Keywords2025-01-13Not public
final order change language2025-01-13Public
Outcome of the Order2025-01-13Not public
Order change the language2025-01-13Public
Reponse a la demande de changement de langue - ArcelorMittal I XPENG (63864 I 2024 - LIT23P0041) PDF-A (signed)2024-12-17Not public
Outcome of the Order2024-12-13Not public
order R 92024-12-13Public
PO changement langue CFI Prdt2024-12-09Not public
Receipt2024-12-03Not public
Application to change language2024-12-02Not public
Application to change language2024-12-02Not public
Receipt2024-12-02Not public
Receipt2024-12-02Not public
Rule 9 application2024-11-29Not public
Rule 9 application2024-11-29Not public
2024.11.29 - Application règle 92024-11-29Not public
2024.11.29 - Application règle 92024-11-29Not public
Acknowledgement of access to case2024-11-29Not public
Acknowledgement of access to case2024-11-29Not public
Acknowledgement of access to case2024-11-29Not public
Acknowledgement of access to case2024-11-29Not public
Acknowledgement of access to case2024-11-29Not public
Acknowledgement of access to case2024-11-29Not public
Acknowledgement of access to case2024-11-29Not public
Acknowledgement of access to case2024-11-29Not public
Acknowledgement of access to case2024-11-29Not public
Acknowledgement of access to case2024-11-28Not public
Acknowledgement of access to case2024-11-22Not public
Acknowledgement of access to case2024-11-12Not public
Notification Of Service2024-10-31Not public
Notification Of Service2024-10-31Not public
Notification Of Service2024-10-31Not public
Notification Of Service2024-10-31Not public
Notification Of Service2024-10-31Not public
Notification Of Service2024-10-31Not public
Notification Of Service2024-10-31Not public
Notification Of Service2024-10-31Not public
Notification Of Service2024-10-31Not public
Notification Of Service2024-10-31Not public
Notification Of Service2024-10-31Not public
Notification Of Service2024-10-31Not public
Notification Of Service2024-10-31Not public
suivi recommandé site de La Poste2024-10-31Not public
suivi recommandé site de La Poste2024-10-31Not public
suivi recommandé site de La Poste2024-10-31Not public
suivi recommandé site de La Poste2024-10-31Not public
suivi recommandé site de La Poste2024-10-31Not public
suivi recommandé site de La Poste2024-10-31Not public
Suivi recommandé site de La Poste2024-10-31Not public
Suivi recommandé site de La Poste2024-10-31Not public
Suivi lettre recommandé site de la Poste2024-10-31Not public
suivi recommandé site de La Poste2024-10-31Not public
Suivi recommandé site de La Poste2024-10-31Not public
Suivi recommandé site de La Poste2024-10-31Not public
Suivi lettre recommandé site de La Poste2024-10-31Not public
Panel-Appointment2024-10-24Not public
epoUploadDocumentsWorkflow2024-10-22Not public
Document from EPO2024-10-22Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Letter-for-Service2024-10-18Not public
Panel-Appointment2024-10-18Not public
EPO-Request-for-case-pending2024-10-18Not public
Receipt2024-10-18Not public
Formal-checks_Notification-of-positive-outcome2024-10-18Not public
Piece XII Extraits des registres des societes XPENG2024-10-18Not public
Piece XXVIII Extraits des registres des societes distributrices2024-10-18Not public
Piece XXIV II Proces verbal des operations d EUROFINSEAG realisees sur le pilier A gauche2024-10-18Not public
Piece VII Certificat de retrait d opt out Extrait du registre de la JUB2024-10-18Not public
Piece XXX Constats des offres et de la mise sur le marche Allemand2024-10-18Not public
Piece XIII Proces verbal de constat d achat de la XPENG aux Pays Bas2024-10-18Not public
Piece XXXI Partie A Constats des offres et de la mise sur le marche sur le territoire Belge2024-10-18Not public
Piece XII Extraits des registres des societes XPENG2024-10-18Not public
Piece XXIII VI Proces verbal des operations du CETIM realisees a Nantes sur le rail arriere de la XPENG2024-10-18Not public
Reponse formelle a la demande de modification du 16 octobre 20242024-10-18Not public
Demande de confidentialite en francais2024-10-18Not public
Piece VI Decision de la division d opposition de l OEB2024-10-18Not public
Liste des pieces visees dans le memoire2024-10-18Not public
Liste des pieces visees dans le memoire2024-10-18Not public
Piece XXVI Extrait de la publication Spurenelemente in Stahlen intitule Ordre approximatif de la trace des elements dans2024-10-18Not public
Piece XXVIII Extraits des registres des societes distributrices2024-10-18Not public
Piece XXXI Partie B Constats des offres et de la mise sur le marche sur le territoire Belge2024-10-18Not public
Piece XXV Extrait de l article A review on Hot Stamping of Advanced High Strength Steels publie dans MDPI2024-10-18Not public
Liste des pieces visees dans le memoire2024-10-18Not public
Demande de confidentialite en francais2024-10-18Not public
Piece XXXIII Constats des offres et de la mise sur le marche sur le territoire Danois2024-10-18Not public
Piece XXIX Constats des offres et de la mise sur le marche sur le territoire Francais2024-10-18Not public
Demande de confidentialite en francais2024-10-18Not public
Piece XXIII III Proces verbal des operations du CETIM realisees a Saint Etienne sur le rail arriere de la XPENG2024-10-18Not public
Liste des pieces visees dans le memoire2024-10-18Not public
Piece VI Decision de la division d opposition de l OEB2024-10-18Not public
Piece VIII Conditions techniques XPENG des aciers pour emboutissage a chaud2024-10-18Not public
Piece XVII Rapport du CETIM sur le pilier A droit2024-10-18Not public
Piece XXIV I Proces verbal des operations d EUROFINSEAG realisees sur le pilier A droit2024-10-18Not public
Piece XIII Proces verbal de constat d achat de la XPENG aux Pays Bas2024-10-18Not public
Demande de confidentialite en francais2024-10-18Not public
Piece V Extraits des registres nationaux2024-10-18Not public
Piece XXVII Partie B Proces verbal de constat du site internet II de XPENG2024-10-18Not public
Demande de confidentialite en francais2024-10-18Not public
Memoire introductif ArcelorMittal2024-10-18Not public
Memoire introductif ArcelorMittal2024-10-18Not public
Memoire introductif ArcelorMittal2024-10-18Not public
Piece XI partie A Proces verbal de constat du site internet I de XPENG2024-10-18Not public
Demande de confidentialite en francais2024-10-18Not public
Piece X Proces verbal de constat internet d articles de presse2024-10-18Not public
Piece XXX Constats des offres et de la mise sur le marche Allemand2024-10-18Not public
Piece XVI Extrait du Guide des interventions d urgence d XPENG2024-10-18Not public
Piece XVIII Rapport du CETIM sur le pilier A gauche2024-10-18Not public
Memoire introductif ArcelorMittal2024-10-18Not public
Piece V Extraits des registres nationaux2024-10-18Not public
Piece XV Proces verbal de constat de decoupe de la XPENG2024-10-18Not public
Piece XXI Rapport de EUROSFINS I EAG sur le pilier A gauche2024-10-18Not public
Piece II Extrait du site internet corporatearcelormittal.com page a propos2024-10-18Not public
Piece XXIII I Proces verbal des operations du CETIM realisees a Saint Etienne sur le pilier A droit de la XPENG2024-10-18Not public
Piece XXXIV Constats des offres et de la mise sur le marche sur le territoire Luxembourgeois2024-10-18Not public
Piece XXXI Partie D Constats des offres et de la mise sur le marche sur le territoire Belge2024-10-18Not public
Liste des pieces visees dans le memoire2024-10-18Not public
Liste des pieces visees dans le memoire2024-10-18Not public
Piece XIX Rapport du CETIM sur le rail arriere2024-10-18Not public
Piece XX Rapport de EUROFINS I EAG sur le pilier A droit2024-10-18Not public
Piece VII Certificat de retrait d opt out Extrait du registre de la JUB2024-10-18Not public
Piece IV Brevet europeen2024-10-18Not public
Piece III Extrait du site internet automotivearcelormittalcom page news and stories2024-10-18Not public
Piece XXII Rapport de EUROSFINS I EAG sur le rail arriere2024-10-18Not public
Piece XI partie C Proces verbal de constat du site internet I de XPENG2024-10-18Not public
Piece XXXIII Constats des offres et de la mise sur le marche sur le territoire Danois2024-10-18Not public
Piece XXIII V Proces verbal des operations du CETIM realisees a Nantes sur le pilier A gauche de la XPENG2024-10-18Not public
Piece XXXI Partie C Constats des offres et de la mise sur le marche sur le territoire Belge2024-10-18Not public
Piece IX Articles sur la commercialisation de la XPENG en Europe2024-10-18Not public
Piece XXIV III Proces verbal des operations d EUROFINSEAG realisees sur le rail arriere2024-10-18Not public
Piece XXV Extrait de l article A review on Hot Stamping of Advanced High Strength Steels publie dans MDPI2024-10-18Not public
Piece XXVII Partie A Proces verbal de constat du site internet II de XPENG2024-10-18Not public
Piece XXIII IV Proces verbal des operations du CETIM realisees a Nantes sur le pilier A droit de la XPENG2024-10-18Not public
Memoire introductif ArcelorMittal2024-10-18Not public
Piece XI partie B Proces verbal de constat du site internet I de XPENG2024-10-18Not public
Piece IV Brevet europeen2024-10-18Not public
Piece XXIII II Proces verbal des operations du CETIM realisees a Saint Etienne sur le pilier A gauche de la XPENG2024-10-18Not public
Piece XXXII Constats des offres et de la mise sur le marche sur le territoire Suedois2024-10-18Not public
Piece XXVI Extrait de la publication Spurenelemente in Stahlen intitule Ordre approximatif de la trace des elements dans2024-10-18Not public
Memoire introductif ArcelorMittal2024-10-18Not public
Piece XVI Extrait du Guide des interventions d urgence d XPENG2024-10-18Not public
Extrait du registre du commerce et des societes du Luxembourg pour ArcelorMittal2024-10-18Not public
Piece XXXII Constats des offres et de la mise sur le marche sur le territoire Suedois2024-10-18Not public
Piece VIII Conditions techniques XPENG des aciers pour emboutissage a chaud2024-10-18Not public
Piece XIV Proces verbal de Constat de reception de la XPENG2024-10-18Not public
Demande de confidentialite en francais2024-10-17Not public
Demande de confidentialite en francais2024-10-17Not public
Demande de confidentialite en francais2024-10-17Not public
Piece VIII Conditions techniques XPENG des aciers pour emboutissage a chaud2024-10-17Not public
Demande de confidentialite en francais2024-10-17Not public
Piece VIII Conditions techniques XPENG des aciers pour emboutissage a chaud2024-10-17Not public
Demande de confidentialite en francais2024-10-17Not public
Demande de confidentialite en francais2024-10-17Not public
Formal-checks_Request-for-correction2024-10-16Not public
Acknowledgement-of-lodging2024-10-15Not public
Piece XIII Proces verbal de constat d achat de la XPENG aux Pays Bas2024-10-15Not public
Piece XXIV II Proces verbal des operations d EUROFINSEAG realisees sur le pilier A gauche2024-10-15Not public
Piece XXIV I Proces verbal des operations d EUROFINSEAG realisees sur le pilier A droit2024-10-15Not public
Piece XXVIII Extraits des registres des societes distributrices2024-10-15Not public
Piece XV Proces verbal de constat de decoupe de la XPENG2024-10-15Not public
Piece XXIII I Proces verbal des operations du CETIM realisees a Saint Etienne sur le pilier A droit de la XPENG2024-10-15Not public
Demande de confidentialite en francais2024-10-15Not public
Piece XXIX Constats des offres et de la mise sur le marche sur le territoire Francais2024-10-15Not public
Piece XXVII Partie B Proces verbal de constat du site internet II de XPENG2024-10-15Not public
Piece XXXIII Constats des offres et de la mise sur le marche sur le territoire Danois2024-10-15Not public
Piece XXIII III Proces verbal des operations du CETIM realisees a Saint Etienne sur le rail arriere de la XPENG2024-10-15Not public
Piece XXIII V Proces verbal des operations du CETIM realisees a Nantes sur le pilier A gauche de la XPENG2024-10-15Not public
Piece XXXIII Constats des offres et de la mise sur le marche sur le territoire Danois2024-10-15Not public
Demande de confidentialite en francais2024-10-15Not public
Piece XXI Rapport de EUROSFINS I EAG sur le pilier A gauche2024-10-15Not public
Piece XXVIII Extraits des registres des societes distributrices2024-10-15Not public
Piece XXXII Constats des offres et de la mise sur le marche sur le territoire Suedois2024-10-15Not public
Piece IV Brevet europeen2024-10-15Not public
Piece XVIII Rapport du CETIM sur le pilier A gauche2024-10-15Not public
Piece IX Articles sur la commercialisation de la XPENG en Europe2024-10-15Not public
Piece XXIV III Proces verbal des operations d EUROFINSEAG realisees sur le rail arriere2024-10-15Not public
Piece XIX Rapport du CETIM sur le rail arriere2024-10-15Not public
Piece VII Certificat de retrait d opt out Extrait du registre de la JUB2024-10-15Not public
Piece V Extraits des registres nationaux2024-10-15Not public
Piece XX Rapport de EUROFINS I EAG sur le pilier A droit2024-10-15Not public
Piece V Extraits des registres nationaux2024-10-15Not public
Piece XXXI Partie B Constats des offres et de la mise sur le marche sur le territoire Belge2024-10-15Not public
Piece XIV Proces verbal de Constat de reception de la XPENG2024-10-15Not public
Piece XXIII VI Proces verbal des operations du CETIM realisees a Nantes sur le rail arriere de la XPENG2024-10-15Not public
Piece III Extrait du site internet automotivearcelormittalcom page news and stories2024-10-15Not public
Memoire introductif ArcelorMittal2024-10-15Not public
Piece VII Certificat de retrait d opt out Extrait du registre de la JUB2024-10-15Not public
Piece XXXI Partie C Constats des offres et de la mise sur le marche sur le territoire Belge2024-10-15Not public
Piece XVI Extrait du Guide des interventions d urgence d XPENG2024-10-15Not public
Piece VI Decision de la division d opposition de l OEB2024-10-15Not public
Liste des pieces visees dans le memoire2024-10-15Not public
Piece XXX Constats des offres et de la mise sur le marche Allemand2024-10-15Not public
Memoire introductif ArcelorMittal2024-10-15Not public
Extrait du registre du commerce et des societes du Luxembourg pour ArcelorMittal2024-10-15Not public
Piece XXXI Partie A Constats des offres et de la mise sur le marche sur le territoire Belge2024-10-15Not public
Demande de confidentialite en francais2024-10-15Not public
Piece XXX Constats des offres et de la mise sur le marche Allemand2024-10-15Not public
Liste des pieces visees dans le memoire2024-10-15Not public
Piece XIII Proces verbal de constat d achat de la XPENG aux Pays Bas2024-10-15Not public
Memoire introductif ArcelorMittal2024-10-15Not public
Piece XXXIV Constats des offres et de la mise sur le marche sur le territoire Luxembourgeois2024-10-15Not public
Liste des pieces visees dans le memoire2024-10-15Not public
Piece XXVI Extrait de la publication Spurenelemente in Stahlen intitule Ordre approximatif de la trace des elements dans2024-10-15Not public
Piece XI partie A Proces verbal de constat du site internet I de XPENG2024-10-15Not public
Piece XI partie B Proces verbal de constat du site internet I de XPENG2024-10-15Not public
Liste des pieces visees dans le memoire2024-10-15Not public
Memoire introductif ArcelorMittal2024-10-15Not public
Piece XVI Extrait du Guide des interventions d urgence d XPENG2024-10-15Not public
Liste des pieces visees dans le memoire2024-10-15Not public
Piece IV Brevet europeen2024-10-15Not public
Demande de confidentialite en francais2024-10-15Not public
Piece XXXI Partie D Constats des offres et de la mise sur le marche sur le territoire Belge2024-10-15Not public
Piece XXVII Partie A Proces verbal de constat du site internet II de XPENG2024-10-15Not public
Piece XXXII Constats des offres et de la mise sur le marche sur le territoire Suedois2024-10-15Not public
Demande de confidentialite en francais2024-10-15Not public
Piece XII Extraits des registres des societes XPENG2024-10-15Not public
Piece VI Decision de la division d opposition de l OEB2024-10-15Not public
Memoire introductif ArcelorMittal2024-10-15Not public
Piece II Extrait du site internet corporatearcelormittal.com page a propos2024-10-15Not public
Piece XXIII II Proces verbal des operations du CETIM realisees a Saint Etienne sur le pilier A gauche de la XPENG2024-10-15Not public
Demande de confidentialite en francais2024-10-15Not public
Piece XXII Rapport de EUROSFINS I EAG sur le rail arriere2024-10-15Not public
Piece XI partie C Proces verbal de constat du site internet I de XPENG2024-10-15Not public
Piece VIII Conditions techniques XPENG des aciers pour emboutissage a chaud2024-10-15Not public
Piece XXVI Extrait de la publication Spurenelemente in Stahlen intitule Ordre approximatif de la trace des elements dans2024-10-15Not public
Piece XXV Extrait de l article A review on Hot Stamping of Advanced High Strength Steels publie dans MDPI2024-10-15Not public
Memoire introductif ArcelorMittal2024-10-15Not public
Piece X Proces verbal de constat internet d articles de presse2024-10-15Not public
Piece VIII Conditions techniques XPENG des aciers pour emboutissage a chaud2024-10-15Not public
Piece XXV Extrait de l article A review on Hot Stamping of Advanced High Strength Steels publie dans MDPI2024-10-15Not public
Piece XII Extraits des registres des societes XPENG2024-10-15Not public
Piece XVII Rapport du CETIM sur le pilier A droit2024-10-15Not public
Liste des pieces visees dans le memoire2024-10-15Not public
Piece XXIII IV Proces verbal des operations du CETIM realisees a Nantes sur le pilier A droit de la XPENG2024-10-15Not public