·EP2867997: WIRELESS INDUCTIVE POWER TRANSFER

Verfahrensdetails
Status
Verfahrensart
Kostenfestsetzung
Kategorie
Kostenfestsetzungen
Parteien
Kläger
Vertreter: Tilmann Müller (Bardehle Pagenberg)
Beklagte
Vertreter: Philipp Cepl (DLA Piper)
Division
Court of Appeal
Richter
Technology
Power Generation
Sprache
Erste Entscheidung
22. Juli 2025
Entscheidungen
  • 2025-07-22
    ZurückgenommenKostenApplication For Costs

    The Court of Appeal of the UPC permitted the withdrawal of a cost-assessment application (R. 151 RoP) filed by Philips at the Court of Appeal, which had been submitted in error. The correct forum for cost assessment was the Munich Local Division. No cost decision was required in the context of this withdrawal.

    Rechtsfragen:Withdrawal of cost-assessment application under R. 265 RoPJurisdiction for cost assessment (R. 151 RoP)Court of Appeal vs. Court of First Instance competence for costs
Dokumente