UPC Analytics
DEEN
Übersicht · Eingereicht: 23. Apr. 2025

UPC_CFI_364/2025

FLOW CONTROL SYSTEM

VerletzungWiderklage auf VerletzungParis CDCounter claim for infringementCase ClosedVergleich erfolgt: Vor Hauptsache
Zusammenfassung in einfacher Sprache

Belparts Group N.V.'s counterclaim for infringement of EP 3 812 870 (flow control system) against IMI Hydronic Engineering Deutschland GmbH was withdrawn following an out-of-court settlement, simultaneously with IMI's withdrawal of its revocation action (UPC_CFI_104/2025). The Paris Central Division declared the proceedings closed under R. 265.1 RoP; no costs decision was requested or issued.

Angenommene Argumente
Was das Gericht akzeptiert hat — nach Partei.
  • Withdrawal of counterclaim for infringement by Belparts permissible where both parties consent following settlement

    KlägerRechtsgrundlage: R. 265.1 RoP

    Hinweis: Court permitted withdrawal as no final decision had been taken and neither party had a legitimate interest in a court ruling on the merits.

Zurückgewiesene Argumente
Was das Gericht nicht akzeptiert hat — und warum.

Keine zurückgewiesenen Argumente erfasst.

Zentrale Rechtsgrundsätze
In der Begründung herangezogene Doktrinen und Regeln.