| 2025-12-19 | UPC_CFI_660/2024 | Mannheim LD | Infringement Action | Verletzung (Hauptsache) | Nichtig erklärt | The Court revoked European patent EP 3 652 914 B1 in its entirety in the territories of France and Germany on the basis of the counterclaim for revocation filed by Palo Alto Networks. The claims (including the unconditionally amended main request and all auxiliary requests) were found to lack inventive step in light of the prior art. As a consequence, the infringement action was dismissed. Centripetal was ordered to bear the costs of the litigation. The value in dispute was set at EUR 2 million (EUR 1 million each for the infringement action and counterclaim). |
| 2025-07-30 | UPC_CFI_208/2024 | Munich LD | Application RoP262.1 (b) | — | Nur prozessual | Procedural order (in German) granting Renault SAS (a third party allegedly threatened with infringement of EP 1 770 912 B1 by Avago Technologies) access to the case file and register under Rule 262.1(b) RoP for the completed proceedings, which were terminated by withdrawal of both the infringement action and counterclaim for revocation. The court confirmed that third-party access may be granted to closed proceedings. |
| 2025-05-08 | UPC_CFI_582/2024 | Brussels LD | Generic application | — | Abgewiesen | The Brussels Local Division dismissed Yealink's application for rectification (R. 353 RoP) of the Final Order of 21 March 2025, which had dismissed Barco's application for provisional measures and ordered Barco to pay Yealink's costs up to the EUR 112,000 ceiling. Yealink sought to clarify the order by adding the word 'interim' to the costs award, but the court found no clerical error, miscalculation or obvious omission warranting rectification. The court confirmed that the costs award of EUR 112,000 against Barco (the unsuccessful party in the provisional measures) was already clearly an interim award on the face of the Final Order. |
| 2025-05-01 | APL_64374/2024 | Court of Appeal | Appeal RoP220.1 | motionName.appeal_decision | PI erteilt | The Court of Appeal set aside the Milan Central Division's refusal of provisional measures and granted Insulet a pan-European preliminary injunction against EOFlow's insulin pump device ('EOPatch'/'GlucoMen Day Pump'), finding infringement of EP 4 201 327 and awarding costs to Insulet. |
| 2025-03-21 | UPC_CFI_582/2024 | Brussels LD | Application for provisional measures | — | PI abgelehnt | The Local Division Brussels dismissed Barco's application for provisional measures against Yealink due to lack of urgency. Barco had waited an unreasonably long period before filing, having been aware of the allegedly infringing products since at least May 2023. Barco was ordered to pay Yealink's costs up to EUR 112,000. Dispute value set at EUR 1,000,000. |