UPC Analytics
ENDE
Overview · Filed:

ACT_31493/2025

WIRELESS INDUCTIVE POWER TRANSFER

Procedural & sub-applicationsCosts AssessmentsCourt of AppealApplication For CostsSettled at: Post-merits
  • 2025-07-22WithdrawncostsApplication For Costs

    The Court of Appeal of the UPC permitted the withdrawal of a cost-assessment application (R. 151 RoP) filed by Philips at the Court of Appeal, which had been submitted in error. The correct forum for cost assessment was the Munich Local Division. No cost decision was required in the context of this withdrawal.