UPC CFI 1746/2026
May 19, 2026·EP3427283 · SELECTOR FOR AN ON-LOAD TAP CHANGER AND ON-LOAD TAP CHANGER WITH LOAD TRANSFER SWITCH AND SELECTOR
- Case details
- StatusWritten PhaseActionProvisional measuresCategoryProvisional measures
- Parties
- Claimants
- Reinhausen GmbHOperating co.
Representatives- Tobias Schneider-Luther Rechtsanwaltsgesellschaft mbH
- Detlef Mader-Luther Rechtsanwaltsgesellschaft mbH
- Marius Fischer-Bardehle Pagenberg
Respondents- Shanghai Huaming Power Equipment Co., Ltd.Operating co.
Representatives- Michael Rüberg-Boehmert & Boehmert
- Adrian Steffens-Boehmert & Boehmert
- Division
- Munich LD
- Technology
- Electrical engineeringElectrical machinery, apparatus, energy
- Language
- German
- First decided
- Jul 27, 2026
| Preliminary injunction granted | Median days to first decision | |
|---|---|---|
| All UPC | 54% (38/70) | 124 |
| Munich LD | Locked | Locked |
| Judge Daniel Voss | Locked | Locked |
| Judge Georg Werner | — | Locked |
| Judge Thomas Adocker | Locked | Locked |
At the UPC: Reinhausen GmbH (4 cases)·Shanghai Huaming Power Equipment Co., Ltd. (4 cases)
This dispute contains 1 other proceedings
- 2026-07-27Provisional measuresPublic
Summary: Following the oral hearing of 20 July 2026, the Munich Local Division amended its inspection and evidence-preservation order of 20 May 2026 (Art. 60 UPCA, R. 192 and 199 RoP) concerning EP 3 427 283: the confidentiality obligations of the expert, assistants, the applicant's representatives and the bailiff were reworded, the representatives' access to the description was clarified as arising before the Court decides on its release, and a paragraph agreed by the parties barring communication with the expert and any follow-up examination was added. All further requests were rejected and the order of 20 May 2026 was otherwise maintained.
Show the legal issues (5)
- inspection and preservation of evidence under Art. 60 UPCA and R. 192, 199 RoP
- protection of the respondent's trade secrets during inspection
- timing of the applicant's representatives' access to the expert description
- no follow-up examination outside main proceedings; R. 9.4 RoP time limit to start proceedings on the merits
- withdrawal of an Art. 83(3) UPCA opt-out before the application
| Document title | Date | Public |
|---|---|---|
| Order | 2026-10-20 | Public |
| Order | 2026-10-19 | Not public |
| Order | 2026-10-19 | Not public |
| Receipt | 2026-10-15 | Not public |
| Cover sheet | 2026-10-15 | Not public |
| Submission Applicant | 2026-10-15 | Not public |
| Communication | 2026-10-15 | Not public |
| Other Documents | 2026-10-15 | Not public |
| Receipt | 2026-10-13 | Not public |
| Cover sheet | 2026-10-13 | Not public |