UPC CFI 541/2024
Sep 20, 2024·EP1993363 · COMPOSITION FOR COMBATING ECTOPARASITES AND THEIR OVA
- Case details
- StatusCase ClosedActionProvisional measuresCategoryProvisional measures
- Parties
- Claimants
- G. Pohl-Boskamp GmbH & C. KGOperating co.
Representatives- Thomas Gniadek-Simmons & Simmons
- Sebastian Horlemann
Respondents- pharma-aktiva GmbHOperating co.
- ALDI SÜD Dienstleistungs-SE & Co. oHGOperating co.
- ALDI Nord Deutschland Stiftung & Co. KGOperating co.
- ALDI SE & Co. KGOperating co.
- Hofer KommanditgesellschaftOperating co.
Representatives- Matthias Ringer-Lorenz Seidler Gossel Rechtsanwälte Patentanwälte Partnerschaft mbB
- Alexander von Foullon
- Division
- Mannheim LD
- Technology
- ChemistryBasic materials chemistry
- Language
- German
| Preliminary injunction granted | Median days to first decision | |
|---|---|---|
| All UPC | 54% (38/70) | 124 |
| Mannheim LD | Locked | Locked |
| Judge Peter Tochtermann | Locked | Locked |
| Judge Dirk Böttcher | Locked | Locked |
| Judge Mojca Mlakar | Locked | Locked |
At the UPC: G. Pohl-Boskamp GmbH & C. KG (1 case)·pharma-aktiva GmbH (1 case)
- 2024-12-20
Summary: Order from the Mannheim Local Division dated 20 December 2024 granting provisional measures requested by G. Pohl-Boskamp GmbH & C. KG against pharma-aktiva GmbH, ALDI SÜD, ALDI Nord, ALDI SE, and Hofer KG (Austria) for alleged infringement of EP 1 993 363 B1 (a composition for combating ectoparasites). The provisional measures order prohibits defendants from manufacturing, offering, distributing, using, importing or stocking the infringing products in Germany (defendants 1–4) and Austria (defendants 1 and 5). A penalty of EUR 100 per item non-compliance was imposed. The respondents were also ordered to surrender products in their possession. Defendants were ordered to pay a preliminary cost reimbursement of EUR 11,000 jointly. The measures are effective immediately and will lapse if Syngenta does not commence main proceedings within 31 calendar days / 20 working days from 20 December 2024.
Show the legal issues (4)
- Provisional measures under R. 206 RoP
- Prima facie infringement assessment
- Urgency for preliminary injunction
- Penalty payments for non-compliance
| Document title | Date | Public |
|---|---|---|
| Case closed | 2025-11-26 | Not public |
| Acknowledgement-of-change-of-a-representative | 2025-02-28 | Not public |
| Application-RoP293-Receipt | 2025-02-28 | Not public |
| Formal-checks_Notification-of-positive-outcome | 2025-02-28 | Not public |
| Application-RoP293 | 2025-02-27 | Not public |
| Application | 2025-02-27 | Not public |
| Anordnung einstweilige Verfuegung | 2024-12-20 | Not public |
| Anordnung einstweilige Verfuegung | 2024-12-20 | Public |
| Anordnung aus technischen Gruenden | 2024-12-20 | Public |
| Referenzdokument mündliche Verhandlung | 2024-12-19 | Not public |
G. Pohl-Boskamp GmbH & C.KG applied to the Mannheim Local Division for provisional measures against pharma-aktiva GmbH and ALDI entities for infringement of EP 1 993 363 B1 (polysiloxane composition for combating ectoparasites and their eggs). The court granted the provisional measures order prohibiting the defendants from making, offering, distributing, using or importing the infringing composition in Germany and Austria, declined to require security because defendants had already voluntarily ceased sales, and imposed a fine of EUR 100 per infringing item.
Infringement of EP 1 993 363 B1 (ectoparasite composition) by defendants' product is established at provisional measures stage
ClaimantLegal basis: R. 206 VerfONote: Defendants did not substantially contest the infringement finding; court found the legal standing of the patent sufficiently secure to grant measures.
No security (Sicherheitsleistung) is required because defendants had already ceased distribution and plan to destroy remaining stock
ClaimantLegal basis: Art. 62(5) UPCA; Art. 60(7) UPCA; R. 211.5 VerfONote: Because defendants voluntarily stopped selling and no substantial harm would flow from the order, security would be disproportionate.
Security (Sicherheitsleistung) should be required before granting provisional measures
RespondentLegal basis: Art. 62(5) UPCA; R. 211.5 VerfOReason: Defendants had already ceased distribution; no material harm would result from the order; defendants themselves did not allege impending harm.
Browse other cases on this principle.