UPClytics
View all cases

UPC CFI 450/2024

Jul 30, 2024·EP1875683 · INTEGRATED CIRCUIT WITH DATA COMMUNICATION NETWORK AND IC DESIGN METHOD

Case details
Status
Case Closed (Patent upheld as granted)
Action
Counterclaim for revocation
Category
Counterclaim for revocation
Parties
Claimants
Representatives
Respondents
Representatives
Division
Munich LD
Technology
  • Electrical engineering
    Digital communication
Language
English
First decided
Mar 11, 2026
How this compares
The court's record for this kind of case, counted in first-instance rulings. A figure in brackets is the number of rulings a rate rests on.
Patent revokedMedian days to first decision
All UPC37% (34/91)124
Munich LDLockedLocked
Judge Daniel VossLockedLocked
Judge Pierluigi PerrottiLockedLocked
Judge Georg WernerLockedLocked
Judge Andrea ScillettaLockedLocked

At the UPC: Qualcomm Group (28 cases)·Network System Technologies LLC (77 cases)

This dispute contains 10 other proceedings

UPC CoA 68/2026·UPC CoA 69/2026·UPC CoA 70/2026·UPC CoA 71/2026·UPC CoA 72/2026 and 5 more

9 other defendants litigating the same or a related patent

UPC CoA 217/2024·UPC CoA 218/2024·UPC CoA 224/2024·CC 24453/2024·UPC CFI 167/2024 and 4 more

Start a free trial to see how each one ended.

More cases: Munich LD·2024

Decisions
  • 2026-03-11
    revocation counterclaim

    Summary: 1. The Infringement action is dismissed. 2. The Counterclaim for revocation is dismissed.

Document titleDatePublic
Order2026-04-14Not public
Order2026-04-14Public
Receipt2026-04-13Not public
Cover sheet2026-04-13Not public
Application document Applicant2026-04-13Not public
Hearing recording reference document2026-04-01Not public
Decision2026-03-16Public
Case closed2026-03-11Not public
Decision2026-03-11Not public
Decision2026-03-11Not public
Accepted arguments
What the court agreed with — by party.
  • Claims 1 and 8 as amended during examination do not constitute an inadmissible intermediate generalisation; on a correct construction the complete data package must implicitly be transmitted within N clock cycles

    ClaimantLegal basis: Art. 138(1)(c) EPC, Art. 123(2) EPC, Art. 65(2) UPCA
  • Claims 1 and 8 are novel over Bertozzi and inventive over Bertozzi combined with Nowatzyk (US 6,081,844)

    ClaimantLegal basis: Art. 54 EPC, Art. 56 EPC
  • Width converters and rate adapters in the accused Qualcomm NoC ICs are not M*N data storage elements that delay a whole data package by M*N clock cycles, so feature group 4 is not realised, literally or by equivalence

    RespondentLegal basis: claim construction of claim 1 feature group 4 and claim 8; doctrine of equivalence
Rejected arguments
What the court did not agree with — and why.
  • The amendment of claims 1 and 8 during examination was an inadmissible intermediate generalisation of what was described in the application as filed

    RespondentLegal basis: Art. 138(1)(c) EPC, Art. 123(2) EPC
  • Claims 1 and 8 lack novelty over Bertozzi and lack an inventive step over Bertozzi combined with Nowatzyk

    RespondentLegal basis: Art. 54 EPC, Art. 56 EPC
  • The accused Qualcomm NoC ICs, built on Arteris-derived technology, infringe claims 1 and 8 literally or, in the alternative, by equivalence

    ClaimantLegal basis: Art. 25 UPCA; claim 1 and claim 8 features